QS Tools (Quantity Surveying) ​

The QS group on the DVD Cons tab serves the monthly grind of a quantity surveyor or site engineer: reconciling quantities between two BoQ versions, registering and valuing variation works, and building the interim-payment valuation table for the period.

Each command reads a range you select and generates a new, fully bordered sheet with totals — the source data is left untouched.

Commands in this group ​

CommandWhat it does
Compare BoQMatches two bills of quantities by code → a reconciliation sheet marked Increase / Decrease / New / Removed, with % and value deltas
Variation RegisterBuilds a valued variation register with approval status (Proposed / Approved / Rejected, approval document No.)
Interim PaymentBuilds each period's payment file ("Period n" sheet, Form 03.a/TT layout): approved variations + price adjustment, advance / recovery / retention / VAT; the next period reads this one's cumulative
AI Construction EstimateEstimates unit prices by province/quarter, published bulletin prices first, source labelled on every row — see its own page
Compare drawingsCompare two PDF drawings and show exactly what changed: red is gone, blue is new

Valuing one payment period ​

  1. Reconcile the quantities — open both BoQ versions (tender and as-measured) and click Compare BoQ. Pick File A (original) and File B (new), choose the Scope (Single sheet or Multiple sheets — tick to choose), map Code / match-key column, Description column, Unit column, Quantity column and Unit price column, set Header rows to skip, then click Compare.
  2. Split out what is outside the contract — rows flagged New, and quantities beyond the contract, go into a separate measured variation table with the reason or basis recorded (site instruction number, revised drawing). Tick Also create a Variation register from the changed rows when comparing to skip the copying.
  3. Price what has no rate — for variation items with no contract rate, use AI Construction Estimate for a reference figure, then check it against cost norms and supplier quotations.
  4. Register and approve the variations — select the measured variation table → Variation Register → map Description column, Unit column, Variation qty column (accepts +/−), Unit price column and Reason / basis column; enter Project / package, Default reason, Register / batch No. and Date → Create. When the client approves, set Status to Approved and record the document number. For price adjustment, also create a Price Adjustment sheet.
  5. Build the period payment file — select the BoQ range → Interim Payment → map the columns by letter (Item, Unit, Contract qty, Unit price, Progress) and the progress type (% or quantity, cumulative or this period); enter contract value, advance, recovery, retention and VAT (pre-filled from period 2 on); tick approved variations and price adjustments → Create. Next period, just update progress and run it again.
  6. Issue the submission — the result sheet already has borders and a totals row; export it with Sheets → PDF and attach the variation register and the BoQ reconciliation.

Example ​

The reconciliation step: workbook "BoQ Area A" holds two sheets with the same layout, Du thau and Nghiem thu (B = code, C = description, D = unit, E = quantity, F = unit price). Scope Single sheet, Sheet A = Du thau, Sheet B = Nghiem thu, header rows to skip = 1 → Compare:

CodeQty (A)Qty (B)DeltaStatus
AF.11110120.0132.5+12.5 (+10.4%)Increase
AE.22110850.0812.0−38.0 (−4.5%)Decrease
AK.31120—45.0+45.0New
AB.10100260.0—−260.0Removed

The payment step: workers' housing superstructure BoQ, selection A4:H60: column B item, D unit, E contract quantity, F unit price, G cumulative % complete, H prior cumulative value. Mode Cumulative, Period = "Period 3", Date = 22/08/2026.

ItemUnitContract qtyUnit priceCum. %Cumulative valuePrior cumulativeThis period
Column concretem31201,850,00060%133,200,00088,800,00044,400,000
Blockwork 200m2850265,00040%90,100,00060,000,00030,100,000

In the same period, site instruction 12/CT-CĐT adds lighting-column footings and deletes part of a concrete apron → run Variation Register for batch 2, and the register closes with Total increase / Total decrease / Net variation to attach to the payment file.

Tips and caveats ​

  • Interim Payment, Compare BoQ and Variation Register map columns by sheet column letter (B, E, AA…), while AI Construction Estimate counts columns from the first column of the selection — mixing the two conventions corrupts the whole table.
  • Select the range before clicking the command; none of them auto-detect the table (Compare BoQ instead needs at least two sheets open and refuses the same sheet for both A and B).
  • Compare BoQ matches purely on the code: one character out and the row shows as "Removed" in A and "New" in B; repeated codes within a sheet are summed, and both versions must share the same column layout.
  • In Variation Register the sign convention is mandatory: positive qty = increase, negative qty = decrease; entering a reduction as a positive number breaks the net figure.
  • Choosing the wrong % complete mode (Cumulative vs This period only) makes the period value completely wrong — check the totals row before issuing.
  • Results land on a new sheet and cannot be undone with Ctrl+Z; delete the sheet to discard it. These tables are drafting aids — still check them against the contract forms and current regulations.